Explore the remarkable journey of Court Craft, selected through a competitive tender process by the Coffs Harbour City Council, to design and construct netball courts at Vost Park. This project exemplifies Court Craft’s expertise in sports infrastructure development, showcasing their commitment to delivering top-tier facilities for the community.
Project Overview: The project at Vost Park involved an extensive array of tasks, ranging from site investigation and design to the construction of top-quality netball courts. The comprehensive scope of works included:
- Site Investigation and Design: Court Craft commenced the project with thorough site investigation and design work, laying the foundation for the transformation of Vost Park.
- Subsurface and Surface Court Drainage: The installation of subsurface and surface court drainage systems, including pits and pipes, ensured efficient water management on the courts.
- Stormwater Trench Reinstatement: The asphalt car park surface was enhanced with the reinstatement of the stormwater trench.
- Asphalt Pavement: A suitable asphalt pavement/wearing surface was designed and constructed according to the Principal’s performance requirements, ensuring durability and performance.
- Court Extension: Excavation and preparation work for extending the netball courts south and west, including the installation of new perimeter concrete dish drains.
- Roadbase and Geofabric: A robust foundation was created with the supply and installation of roadbase, geofabric separation, and a laminated Tensar Grid system with minimum roadbase cover.
- Seal and Pavement Layers: A 7mm spray seal and multiple layers of pavement, including DG07 C450 and AC7 typical netball pavement, were applied to meet performance standards.
- Goal Posts and Line Marking: The project included the supply and installation of 18 goal posts and precise line marking to meet netball regulations.
- Concrete Slabs: Construction of three new concrete slabs on the western side of the courts, following supplied plans.
- Fencing: Fencing was installed to define and secure the court area.
- Retaining Walls: Retaining walls were constructed as needed to optimize the layout.
- Lighting: Adequate lighting was provided to ensure safe and enjoyable evening gameplay.
- Landscaping: The project was completed with smoothing and re-grassing of disturbed areas, enhancing the overall aesthetics of the park.
Conclusion: The transformation of Vost Park into a premier netball facility by Court Craft for the Coffs Harbour City Council exemplifies their dedication to delivering outstanding sports infrastructure. This comprehensive project not only showcases their technical expertise but also their commitment to creating vibrant community spaces that cater to the sporting needs of residents. Vost Park’s new netball courts will undoubtedly serve as a hub for athletes and enthusiasts, providing a top-tier facility for years to come. Court Craft’s successful execution of this project reinforces its reputation as leader in the field of sports facility design and construction.